Statistics
Estimation: The $1.5B Mistake of the Hubble Telescope
The Hubble Space Telescope launched in 1990 with a mirror ground 1.3mm too flat - a biased estimator with a systematic error. The fix cost $700M and a Space Shuttle mission. Every ML model trained without checking for bias repeats the same mistake at smaller scale.
- Ridge and Lasso regularization trade bias for variance to reduce test error
- Hubble telescope $700M mirror fix - the cost of an unchecked biased estimator
- A/B testing: consistent estimators ensure results hold at production scale
- BatchNorm uses biased variance estimator (divides by n, not n-1) by design
- Thompson Sampling: Bayesian estimator for multi-armed bandit exploration
- Bessel's correction (n-1): unbiased sample variance used in every stats package
Предварительные знания
- (no prerequisites)
Three Questions for Any Estimator
**April 24, 1990. NASA launches the Hubble Space Telescope.** A 2.4-meter primary mirror - the most precisely polished mirror ever created. Engineers at Perkin-Elmer checked its shape thousands of times with a special instrument called a null corrector. Every time: perfect. The first images from orbit came back blurry. The mirror had been polished with stunning precision - but **systematically wrong**. The null corrector had a design flaw: one lens was displaced by 1.3 mm. Every measurement produced the same error of 2.2 micrometers from the required shape. For three years, astronomy looked through warped glass. The 1993 repair mission cost another $700 million. **This is a story about a biased estimator.**